Ease of Doing Business
These criteria include Starting a Business, Registering Property, Dealing with Construction Permits, Getting Electricity, Getting Credit, Paying Taxes, Trading Across Borders, Protecting Minority Investors, Enforcing Contracts, and Resolving Insolvency.
In India, the Department of Promotion of Industry, and Internal Trade (DPIIT) serves the institutional anchor for the Ease of Doing Business in the country. Under this mandate, DPIIT has identified key areas for reform, and the Housing & Urban Development Department, Govt. of Odisha has already implemented the necessary changes as outlined below.
| Reform No. | Area | Sub Area | Reform Details | Action Taken |
|---|---|---|---|---|
| 82 | Land Administration and Transfer of Land and Property | Property Registration | Digitize and publish data of Property Tax payment dues online in public domain for all the Urban Local Bodies (ULBs) and Panchayats in the State/UT. The searchable metadata available should be: |
|
| 83 | Land Administration and Transfer of Land and Property | Property Registration | I. Mandate each property/plot has a Unique ID across the State |
|
| 84 | Land Administration and Transfer of Land and Property | Property Registration | Design an online system to auto-calculate and pay the property tax for both ULB and Panchayats |
|
| 186 | Obtaining Utility Permits | Obtaining Water connection | Mandate Water Supply authority (Such as ULB, Panchayats among others) to design and publish an online dashboard in public domain to provide information on quality of Water being supplied* to consumers area wise having following parameters and updated on real time basis: i. Water Pressure ii. Water Quality – TDS (Total Dissolve Solids), PPM * Water quality to be monitored at the Central Water Supplying Station/ point of distribution. |
|
| 187 | Obtaining Utility Permits | Obtaining Water connection | Recommend/ Mandate ULB's to include sustainable water use practices such as Rainwater harvesting as a mandatory requirement while providing construction permits for new buildings and as a mandatory requirement for availing utility connections in existing buildings |
|
| 188 | Obtaining Utility Permits | Obtaining Water connection | Recommendation/Mandate ULB's to include sustainable water use practices such as Solid waste/ bio-sludge management as a mandatory requirement while providing construction permits for new buildings and as a mandatory requirement for availing utility connections in existing buildings |
|
| 226 | Construction Permit Enablers | Uniform Building Code | Enact a comprehensive uniform building code/building by-law applicable to the entire State |
|
| 227 | Construction Permit Enablers | Uniform Building Code | Ensure that the uniform building code/building by-law include provisions for risk-based classification of buildings |
|
| 228 | Construction Permit Enablers | Uniform Building Code | Ensure that the uniform building code/building by-law includes accreditation programs and clear responsibilities and penalties, where applicable, for professionals including architects and engineers engaged in the construction process |
|
| 229 | Construction Permit Enablers | Uniform Building Code | Define mandatory qualifications for architects and structural engineers in the uniform building by-law applicable in State/UT |
|
| 230 | Construction Permit Enablers | Uniform Building Code | Ensure building regulation /code/standard have provisions to dispute the decision of the local authority |
|
| 231 | Construction Permit Enablers | Construction permit | Develop legally valid master plans/zonal plans/land use plans for all urban and Panchayat areas and make it available online in public domain |
|
| 232 | Construction Permit Enablers | Construction permit | Mandate time-bound delivery through a legislation such as: 1. Right to Services Act / Public Service guarantee Act 2. Equivalent act with punitive provisions and grievance mechanism in case the stipulated timelines are not met For the following 3 stages of construction permits 1. Building Plan Approval 2. Permission for Alteration and Addition/Revision/Revalidation of Building Plan 3. Permission for Demolition and Reconstruction of Building 4. Plinth Approval 5. Occupancy/Completion certificate Ensure the time limit should not exceed 45 days |
|
| 233 | Construction Permit Enablers | Construction permit | Publish information about fees, procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State/UT approvals |
Dedicated Information page is available on the website. |
| 234 | Construction Permit Enablers | Construction permit | Ensure formal land use planning/zoning regulations incorporate the following: i. Requirements for trunk infrastructure availability (water, electricity, sanitation) ii. Hazard maps that identify areas in which construction is not permitted due to natural hazards iii. Hazard maps that identify minimum separation between residential and hazardous occupancies iv. Maps that identify areas in which construction of buildings is not permitted in relation to natural resources |
|
| 235 | Construction Permit Enablers | Construction permit approval | Design and develop an online single window system for granting construction permits with following functionalities: |
Complete online process for applying for Online Building Permit Approval system and related sub-services has been made live since February 2021 |
| 237 | Construction Permit Enablers | Construction permit approval | Implement a system to allow approval based on third party certification (during construction and/or completion stage, as applicable) of structural design and architectural drawings by authorized structural engineers and architects respectively across all urban areas and IDCs |
|
| 238 | Construction Permit Enablers | Construction permit approval | Mandate to Publish an online dashboard in public domain with following features: |
Online Dashboard is available on the Home page of Department’s Citizen Service Portal (SUJOG) website |
| 239 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level | Inspection by Building Proposal Office/ relevant agency as part of obtaining construction permit & for Alteration and Addition/Revision/Revalidation of Building Plan/Permission for Demolition and Reconstruction of Building |
|
| 240 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level Inspection and obtaining completion/ occupancy certificate | Inspection by Building Proposal Office/ relevant agency as part of obtaining occupancy/completion certificate: |
|
| 241 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level Inspection and obtaining completion/ occupancy certificate | Mandate that inspections (except in case of complaint-based inspections) shall be limited to the checklist published on the Department's website |
|
| 242 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level Inspection and obtaining completion/ occupancy certificate | Design and implement a computerized system for identifying building/area that needs to be inspected based on risk assessment: |
Complete online process for applying for Online Building Permit Approval system and related sub-services has been made live since February 2021 |
| 243 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level Inspection and obtaining completion/ occupancy certificate | Design and implement a system for computerized allocation of inspectors |
Complete online process for applying for Online Building Permit Approval system and related sub-services has been made live since February 2021 |
| 244 | Construction Permit Enablers | Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process, Plinth Level Inspection and obtaining completion/ occupancy certificate | Mandate online submission of inspection report within 48 hours to the Department |
|
| 260 | Sector Specific- Trade License | Trade License | Ensure that information is available on website on all necessary components for availing a service such as comprehensive list of documents required, fee, procedure with stage wise details and time for completion of each procedure/ step, searchable based on risk category, size of firm, business location and Foreign/ Domestic investor |
|
| 261 | Sector Specific- Trade License | Trade License | Mandate time-bound delivery through a legislation such as: 1. Right to Services Act / Public Service guarantee Act 2. Equivalent act with punitive provisions and grievance mechanism in case the stipulated timelines are not met |
Time for approval mandated under Odisha Right to Public Services Act for Provisional Trade License Certificate – 1 day. Time for approval mandated under Odisha Right to Public Services Act for Provisional Trade License Certificate – 90 days. Deemed approval for Trade License Certificate has been introduced and the same is granted after 90 days upon submission of the online application. |
| 262 | Sector Specific- Trade License | Trade License | States to have an online system and ensure the following features without the requirement of physical visit to the department: i. Submission of application ii. Payment of application fee iii. Track status of application iv. Download the final signed certificate v. Third party verification |
Complete online process for obtaining for Trade license has been made live since September 2021. |
| 263 | Sector Specific- Trade License | Trade License | Reduce the number of documents required for obtaining trade license to only two: ID Proof and Lease Deed/Legal Occupancy document |
Applicants submit only two documents for obtaining Trade License on SUJOG. The list of documents and relevant documents are mentioned on the Homepage of the website for citizens. Information. |
| 264 | Sector Specific- Trade License | Trade License | Mandate to Publish an online dashboard in public domain with following features: i. Clearly publish the data on number of applications received and granted, and the time taken and fee incurred to grant approvals/certificate ii. Highlight that the dashboard is updated preferably on real time or updated regularly (daily/weekly/fortnightly/monthly). Date and time of modification may be mentioned |
Online Dashboard is available on the Home page of Department’s Citizen Service Portal (SUJOG) website |
| 265 | Sector Specific- Trade License | Trade License | Eliminate the requirement of renewal of registration or allow auto-renewal |
Allowing citizens to apply for Trade License for a period of 5 years, thereby eliminating the requirement to renew the license every year |